Alerts & Advisories

Mobile Alerts

Current Conditions tells you about service disruptions happening on the system right now.
Transit Alerts give you details on bus re-routes, special events or other planned transit service disruptions.
Station Access alerts will advise you if an elevator or escalator is out of service.



Know Before You Go
Want to be notified when your trip or favorite route has an alert? Sign up to receive transit alerts via SMS or email and know before you go! We also push out alerts and other transit-related info on our Twitter account.  

  • Current Conditions

    LocationEffective
    Bus:
    Operating Normally
    Feb 22 2012
    3:40:PM
    SkyTrain:
    Operating normally.
    Feb 22 2012
    3:39:PM
    SeaBus:
    Operating normally.
    Feb 22 2012
    3:39:PM
    West Coast Express:
    Operating Normally
    Feb 22 2012
    3:39:PM
    West Van Blue Bus:
    Operating Normally
    Feb 22 2012
    3:39:PM
    HandyDART:
    Operating normally.
    Feb 22 2012
    3:39:PM
  • Transit Alerts

    LocationEffective
    • SkyTrain: Canada Line Track Maintenance

      SkyTrain:
      Canada Line Track Maintenance
      Feb 26 2012
      9:00:PM
      Priority: Minor

      Effective Sunday February 26th, from 9:00pm until end of service.

      Canada Line will be running on single track (inbound track) between Waterfront Station and Olympic Village Station.

      Passengers will need to use the inbound platforms at Waterfront, Vancouver City Centre, Yaletown-Roundhouse, and Olympic Village Stations for loading and unloading.

      Trains will be running approximately every 15 minutes.

      Two short-loop shuttle trains will be put in place. One will run between Richmond-Brighouse and Marine Drive Stations, and the other will run between YVR-Airport and Marine Drive Stations.

      The last outbound trains will depart stations approximately 5 minutes later than normal timetable stated times. Canada Line will be in contact with CMBC operators to minimize impact to connecting passengers.

      All shuttle trains and single-tracking affected platforms will be staffed and trains traveling through the single-tracking portion of the system between Waterfront and Olympic Village Stations will be staffed as well.

    • Bus: 2 Construction Reroute

      Bus:
      2 Construction Reroute
      Feb 23 2012
      7:30:AM
      Priority: Minor

      Effective Thursday February 23rd, from 7:30am to 5:30pm.

      Due to construction, the following reroute will apply:

      2 Macdonald-16th Ave: Regular route to W 16th Ave & Balaclava St, then via Balaclava St, turn around to eastbound W 16th Ave to temporary terminus on W 16th Ave & Balaclava St.
      2 Burrard Station: From temporary terminus Eastbound W 16th Ave & Balaclava St via regular route.

    • Bus: 2 33 Temp Stop Cancellations

      Bus:
      2 33 Temp Stop Cancellations
      Feb 23 2012
      7:30:AM
      Priority: Minor

      Effective Thursday February 23rd, from 7:30am to 5:30pm.

      Due to construction, the following stops will be temporarily discontinued:

      • Stop 50115 Westbound W 16 Ave at Mackenzie St
      • Stop 50054 Eastbound W 16 Ave at Trutch St
    • Bus: 3 Temp Stop Relocation

      Bus:
      3 Temp Stop Relocation
      Feb 23 2012
      12:00:AM
      Priority: Minor

      Effective Thursday February 23rd to Monday February 27th, 2012.

      Due to construction, stop 50238 Southbound Main St at E Broadway will be temporarily relocated south to the intersection of Main St at E 10 Ave.

    • Bus: 7 32 N22 Temp Stop Cancellation

      Bus:
      7 32 N22 Temp Stop Cancellation
      Feb 22 2012
      12:00:AM
      Priority: Minor

      Effective Wednesday February 22nd to Wednesday February 29th, 2012.

      Due to construction, stop 50299 Northbound Dunbar St at W 39th Ave will be temporarily discontinued.

    • Bus: 129 Temp Stop Relocation

      Bus:
      129 Temp Stop Relocation
      Feb 22 2012
      12:00:AM
      Priority: Minor

      Effective Wednesday February 22nd to Friday March 9th, 2012.

      Due to construction, stop 58346 Southbound Gilmore Ave at Henning Dr will be temporarily relocated north to the intersection of Gilmore Ave at Lougheed Hwy.

    • Bus: Attention 26 Customers

      Bus:
      Attention 26 Customers
      Feb 21 2012
      8:11:AM
      Priority: Minor

      Effective Tuesday February 21 to Thursday February 23, 2012.

      Due to construction stop 51646 Southbound Tyne St & E. 47th Ave will be temporarily discontinued.

    • Bus: 25 Schedule Adjustment

      Bus:
      25 Schedule Adjustment
      Feb 20 2012
      12:00:AM
      Priority: Minor

      Effective Monday February 20th, 2012.

      The 25 Brentwood Station Monday to Friday trip leaving UBC Loop at 11:54am will now depart at 11:52am.

    • Bus: Attention 320 341 Customers

      Bus:
      Attention 320 341 Customers
      Feb 20 2012
      12:00:AM
      Priority: Minor

      Effective Monday February 20th until Friday February 24th, 2012.

      Due to construction at the Langley Centre, Bay 2 will be temporarily cancelled. Services using Bay 2 (320 Surrey Central Station and 341 Guildford Exchange) will temporarily be using Bay 3.

      View temporary bay assignments

    • Bus: Attention 239 246 Customers

      Bus:
      Attention 239 246 Customers
      Feb 17 2012
      11:55:AM
      Priority: Minor

      Effective Monday February 20 to Friday February 24, 2012

      Due to construction on Chesterfield between 1st & Esplanade the following reroute will apply.

      239/246 Eastbound Quay: Regular route to 3 St & St Chesterfield then continue on 3 St then via R/ Lonsdale, R/ Carrie Cates then regular route

      239/246 Park Royal/Highland: Regular route Lonsdale & Esplanade then continue on Lonsdale then via L/ 3 St, then regular route

    • Bus: Attention 410 Customers

      Bus:
      Attention 410 Customers
      Feb 16 2012
      10:15:AM
      Priority: Minor

      Effective Monday February 20, 2012.

      The 410 22nd Street Station trip leaving Chatham Road at 2nd Avenue @ 3:04p.m. will be adjusted to leave 2 minutes earlier at 3:02p.m. All subsequent timing points will also be adjusted 2 minutes earlier to arrive at 22nd Street Station 4:18p.m.

    • Bus: 129 Temp Stop Cancellation

      Bus:
      129 Temp Stop Cancellation
      Feb 16 2012
      12:00:AM
      Priority: Minor

      Effective Tuesday February 16th until further notice.

      Stop 52908 Southbound Holdom Ave at Hastings St is temporarily cancelled. Please board on Hastings St at Howard Ave or on Holdom Ave at Georgia St.

    • Bus: 321 Stop Reinstated

      Bus:
      321 Stop Reinstated
      Feb 14 2012
      12:00:AM
      Priority: Minor

      Effective Tuesday February 14th, 2012.

      Stop 55425 Northbound King George Blvd at 94A Ave is now back in service.

    • Bus: 49 Schedule Adjustment

      Bus:
      49 Schedule Adjustment
      Feb 13 2012
      12:00:AM
      Priority: Minor

      Effective Monday February 13th, 2012.

      The 49 UBC trips leaving Metrotown Monday-Friday at 7:18am and 9:39am have been advanced by two minutes to leave at 7:16am and 9:37am.

    • Bus: N6 N9 N10 N17 Temp Stop Relocation

      Bus:
      N6 N9 N10 N17 Temp Stop Relocation
      Feb 13 2012
      12:00:AM
      Priority: Minor

      Effective Monday February 13th to Saturday March 3rd, 2012.

      Due to construction, stop 61522 Southbound Howe St at Davie St will be temporarily relocated north to the intersection of Howe St at Helmcken St.

    • Bus: Attention C37 Customers

      Bus:
      Attention C37 Customers
      Feb 10 2012
      9:34:AM
      Priority: Minor

      Effective Friday February 10th to Friday March 9th, 2012.

      Due to construction, stop 53861 Westbound Coquitlam Ave at Wellington St will be temporarily cancelled.

    • Bus: Attention 401 C93 Customers

      Bus:
      Attention 401 C93 Customers
      Feb 9 2012
      12:00:AM
      Priority: Minor

      Effective February 9th to February 24th 2012

      Due to construction stop 56422 Northbound No. 1 Rd & Chatham St will be temporarily discontinued.

    • Bus: Attention 99 B-Line Customers

      Bus:
      Attention 99 B-Line Customers
      Feb 8 2012
      1:19:PM
      Priority: Minor

      Effective February 8, 2012 and for six weeks.

      99 Commercial Broadway/Boundary: Due to construction Bus stop 59997 located Eastbound Broadway & Arbutus Street will be temporarily re-located to a new stop 61660 Eastbound W Broadway, between Yew St and Arbutus St.

    • Bus: Attention 25 33 Customers

      Bus:
      Attention 25 33 Customers
      Feb 6 2012
      12:00:AM
      Priority: Minor

      Effective Monday February 6th to Sunday February 26th, 2012.

      Due to construction stop 51593 Westbound W 16th Av at Wallace will be temporarily discontinued.

    • Bus: Attention 229 230 232 Customers

      Bus:
      Attention 229 230 232 Customers
      Feb 2 2012
      11:36:AM
      Priority: Minor

      Effective Thursday February 2 To Wednesday February 29, 2012.

      Due to construction the stop 54200 Northbound Lonsdale Av & 21st St will be temporarily relocated 30 Meters further ahead.

    • Bus: Attention 239 246 Customers

      Bus:
      Attention 239 246 Customers
      Feb 1 2012
      12:00:AM
      Priority: Minor

      Effective Wednesday, February 1st until Wednesday, February 29th,  2012 from 9:00am until 5:00pm.

      Due to construction stop# 54420 Southbound Chesterfield at 1 St will be temporarily discontinued.

    • Bus: Attention 26 & 16 Customers

      Bus:
      Attention 26 & 16 Customers
      Jan 31 2012
      12:00:AM
      Priority: Minor

      Effective Tuesday January 31 to Friday February 24, 2012

      Due to construction stops 51074 Northbound Earles St & Kings Av and stop 51058 Southbound Earles Av & Vanness Av will be temporarily discontinued.

    • Bus: 106 Temp Stop Cancellation

      Bus:
      106 Temp Stop Cancellation
      Jan 11 2012
      12:00:AM
      Priority: Minor

      Effective Wednesday January 11th to Friday February 24th, 2012.

      Due to construction, stop 52413 Eastbound Edmonds St at Mary Ave will be temporarily discontinued.

    • Bus: C94 Construction Reroute

      Bus:
      C94 Construction Reroute
      Dec 21 2011
      12:00:AM
      Priority: Minor

      Effective Saturday January 28 to Friday February 24th, 2012, From 7:00am to 7:00pm.

      Due to construction, the following reroute will apply:

      C94 Richmond Oval: Regular route to temporary terminus on Elmbridge Way & Hollybridge Way.
      C94 Brighouse Station: From temporary terminus on Elmbridge Way & Hollybridge Way via Elmbridge Way, Westminster Hwy, then regular route. 
      View reroute map

    • Bus: 501 Routing Change Effective December 19 until further notice

      Bus:
      501 Routing Change Effective December 19 until further notice
      Dec 19 2011
      12:00:AM
      Priority: Minor

      As a result of the significant delays from the Trans-Canada Highway improvement project construction the #501 will be re-routed until further notice. When the Trans-Canada highway is backed up the #501 coaches will operate via regular routing along Golden Ears Way to 176th Street then continue on 96th Avenue, Right 160th Street, Left 104th Avenue, and then regular routing to Surrey Central Station.
      There are no stops impacted by this temporary routing change and by avoiding traffic delays along the highway it should create more consistent running times for customers. This temporary routing change is planned to last for the duration of construction along the Trans-Canada Highway.

      View reroute map

    • SeaBus: Lonsdale Quay Hoarding Construction

      SeaBus:
      Lonsdale Quay Hoarding Construction
      Dec 19 2011
      12:00:AM
      Priority: Minor

      Effective Monday, January 2nd, 2012 until further notice.

      The third phase of construction will commence.

      This will result in a reduction of TVMs to a total of four.

      Signage has been placed around the construction site to direct passengers to and from the terminal entrance and around the construction site.


      Effective Tuesday, October 11th, 2011 until further notice.

      Due to construction hoarding and modular fencing will go up at the SeaBus Terminal at Lonsdale Quay.

      Passengers will need to walk around the hoarding to access the existing station entrance.

    • Bus: Bus Shelters in Burnaby

      Bus:
      Bus Shelters in Burnaby
      Nov 22 2011
      12:00:AM
      Priority: Major

      Effective November 22nd 2011, until further notice.

      Some areas in Burnaby will have shelters removed temporarily while the City of Burnaby makes arrangements to replace them at 32 different locations.

      Inquiries on the specifics of the shelter removals and reinstallations may be directed to the City of Burnaby.

    • Bus: C76 Detour routing Nov 7 to April 2012 approx.

      Bus:
      C76 Detour routing Nov 7 to April 2012 approx.
      Nov 7 2011
      12:00:AM
      Priority: Minor

      Change to Detour of C76 Route:
      Effective with first bus on Monday November 7th, the existing detour routing for the C76 Scottsdale Exchange/Ladner Exchange route will be revised, as follows (changes in bold):

      C76 Scottsdale Exchange: From Ladner Exchange via Harvest, Ladner Trunk, 72nd St., 44th Ave. (Churchill), to the round-about (just west of 80th Street), continue through round-about to operate westbound on Churchill, R/72nd Street, Ladner Trunk, Matthews Exchange, Ladner Trunk, Hwy.10, Scott (120th St.), 74th Ave. to Scottsdale Exchange.


      C76 Ladner Exchange: From Scottsdale Exchange via regular routing to Matthews Exchange, then via Ladner Trunk, 72nd Street, 44th Ave. (Churchill), to the round-about (just west of 80th Street), continue through round-about to operate westbound on Churchill R/72nd Street, Ladner Trunk, Harvest to Ladner Exchange.


      As shown on the attached map, the C76 will now serve bus stops 61499 (e/b Churchill Street, f/s Athabaska Street) and a new bus stop, 61029 (w/b Churchill, f/s 80th Street). This detour will be in effect until the overpass on 80th Street is completed.

      View Map

    • Bus: Joyce Station Construction

      Bus:
      Joyce Station Construction
      Sep 26 2011
      12:00:AM
      Priority: Minor

      Effective Monday September 26th, 2011 for approximately one year.

      Bay 4 at the Joyce/Collingwood Station will be closed due to construction. The 41 UBC will depart from the new Bay 6 located east of Joyce St on Vaness Ave.

    • Bus: Attention 312 314 319 321 391 640 C71 N19 Customers

      Bus:
      Attention 312 314 319 321 391 640 C71 N19 Customers
      Aug 15 2011
      12:00:AM
      Priority: Minor

      Effective Monday August 15th, 2011.

      Due to station construction, transit at Scott Road Station will operate from a new, temporary exchange. The temporary exchange, immediately north of the existing exchange, will feature seven bays. Bay assignments will be revised, as per the diagram below.

      View Revised Bus Loop Map

  • Station Access

    LocationEffective
    • Scott Road Station: Elevator/Escalator out of Service

      Scott Road Station:
      Elevator/Escalator out of Service
      Mar 6 2012
      12:00:AM
      Priority: Major

      Effective February 1st until October 2012 - Elevator Unavailable due to Faregate Construction

      The Scott Road Station elevator (west side) will be out of service due to station renovations for the TransLink Compass card and Faregate project.

      Passengers with mobility impairments arriving by bus and requiring an elevator to access the SkyTrain platform may ask an onsite SkyTrain Construction Guide for assistance which will usually be a taxi ride to the elevator on the station’s east side.

      Passengers with mobility impairments arriving by bus and requiring an elevator to access the SkyTrain platform may also board the C71 community shuttle. The C71 connects Scott Road, Gateway and Surrey Central stations with hourly service seven days a week and every half hour Monday to Friday during the morning and afternoon rush.

      Passengers with mobility impairments arriving by SkyTrain and requiring an elevator to access the bus loop should use the elevator on the east side of the station and then ask an onsite SkyTrain Construction Guide for assistance.

    • Surrey Central Station: Elevator/Escalator Out Of Service

      Surrey Central Station:
      Elevator/Escalator Out Of Service
      Mar 6 2012
      12:00:AM
      Priority: Major

      Effective Wednesday February 1st to Tuesday July 31st, 2012.

      In preparation for the electronic fare card and faregates, the Surrey Central elevator and the north entrance (including the escalator and stairs) will be closed. We regret the inconvenience however the work is necessary to complete the construction needed to install the new faregates.

      During construction, we ask passengers with mobility impairments who require the use of an elevator to use Gateway or King George as their alternate station.

      There are four different bus routes connecting Surrey Central and Gateway stations, providing up to 20 trips per hour throughout most of the day. These routes are:

      1. C71 Surrey Central Station/Scott Road Station
      2. C73 Guildford/Surrey Central Station
      3. 332 Guildford/Surrey Central Station
      4. 335 Fleetwood/Surrey Central Station

      People who use the elevator now will need to allow extra time for their trips.

      Extra staff will be on hand to provide assistance.

    • Braid Station: Escalator Out Of Service

      Braid Station:
      Escalator Out Of Service
      Mar 5 2012
      9:00:AM
      Priority: Minor

      Effective Monday March 5th, from 9:00am until Friday March 9th, 5:30pm.

      Due to scheduled maintenance, the "up" escalator from the ticket vending machine level to the VCC-Clark bound platform level will be out of service.

    • Gateway Station: Elevator Out Of Service

      Gateway Station:
      Elevator Out Of Service
      Feb 28 2012
      9:00:AM
      Priority: Minor

      Effective Tuesday February 28th, from 9:00am to 3:00pm.

      Due to scheduled maintenance, the elevator at 108th Street entrance to the concourse and platform levels will be out of service.

      Passengers requiring assistance are to pick up the red emergency phone or obtain assistance from a SkyTrain Attendant.

    • New Westminster Station: Station Alerts

      New Westminster Station:
      Station Alerts
      Feb 21 2012
      12:00:AM
      Priority: Minor

      Effective Thursday February 23rd, from 9:00am to 3:00pm.

      Due to ongoing construction, the west end of the outbound (to VCC/Clark & King George) platform will be partially closed.


      Effective Tuesday February 21st until Monday March 12th, 2012.

      Temporary Closure of Emergency Exit Stairway at New Westminster Station

      The eastbound (to VCC/Clark & King George) emergency exit stairway at New Westminster station will be closed for three weeks due to ongoing construction.

      During this period, SkyTrain staff will attend the platform to direct passengers away from the stairs in case of an emergency.


      Effective Monday February 20th 9:00am until Friday February 24th 5:30pm, 2012.

      The 'up' escalator from the concourse level to the westbound platform level will be temporarily out of service due to scheduled maintenance.


      Effective Monday February 6th until May 2012.

      Preliminary Faregate Construction at New Westminster Station

      Construction will start at New Westminster station in preparation for faregate equipment installation in May 2012. Construction work will be coordinated with the rest of the Plaza 88 development.

      Passengers may need to walk around hoarding and modular fencing to access the existing entrances.


      Effective Monday June 6th, 2011 until further notice.

      The elevator from McNeely Street entrance to the westbound platform level will be out of service due to construction.

      Passengers wishing to travel westbound from New Westminster, please take an eastbound train to Columbia and at Columbia Station, and change over to a westbound train.

      Passengers wishing to disembark at New Westminster from a westbound train, please continue to 22nd St. Station and change over to an eastbound train.

    • Holdom Station: Station Alerts

      Holdom Station:
      Station Alerts
      Feb 15 2012
      12:00:AM
      Priority: Minor

      Effective Wednesday February 15th to May, 2012.

      Construction will start at Holdom station in preparation for faregate equipment installation in May 2012.

      Passengers may need to walk around hoarding and modular fencing to access the existing entrances.

    • Brentwood Station: Station Alerts

      Brentwood Station:
      Station Alerts
      Feb 14 2012
      12:00:AM
      Priority: Minor

      Effective Tuesday February 14th to May, 2012.

      Construction will start at Brentwood station in preparation for faregate equipment installation in May 2012.

      Passengers may need to walk around hoarding and modular fencing to access the existing entrances.

    • Patterson Station: West Entrance Access

      Patterson Station:
      West Entrance Access
      Feb 13 2012
      12:00:AM
      Priority: Minor

      Effective Tuesday, October 18th 2011 until Monday March 5th, 2012.

      The existing south entrance at Patterson Station will be closed to accommodate faregate construction.

      Passengers may enter the station via the existing north entrance (on Central Blvd, elevator accessible) or the temporary west ramp entrance (on Patterson Av).

      A temporary widwalk is also in place to redirect passengers around the closed south entrance.

    • Gilmore Station: Station Alerts

      Gilmore Station:
      Station Alerts
      Feb 3 2012
      12:00:AM
      Priority: Minor

      Effective Friday February 3rd to May, 2012.

      Construction will start at Gilmore Station in preparation for faregate equipment installation in May 2012.

      Passengers may need to walk around the hoarding and modular fencing in order to access the existing entrance.

    • 29th Avenue Station: Station Alerts

      29th Avenue Station:
      Station Alerts
      Jan 30 2012
      3:27:PM
      Priority: Minor

      Effective Tuesday December 6th, 2011 until further notice.

      Due to construction, the south entrance is temporarily closed.

      Effective Monday November 14th, 2011 until further notice.

      Hoarding and modular fencing will go up at 29th Avenue station for the start of faregate construction.

      Passengers will need to walk around the hoarding to access the existing station entrance.

    • Broadway City Hall Station: Station Alerts

      Broadway City Hall Station:
      Station Alerts
      Jan 30 2012
      12:00:AM
      Priority: Minor

      Effective Monday January 30th to May, 2012.

      Construction will start at Broadway-City Hall Station in preparation for faregate equipment installation in May 2012.

      Passengers may need to walk around the hoarding and modular fencing in order to access the existing entrance.

    • Olympic Village Station: Station Alerts

      Olympic Village Station:
      Station Alerts
      Jan 30 2012
      12:00:AM
      Priority: Minor

      Effective Monday January 30th to May, 2012.

      Construction will start at Olympic Village Station in preparation for faregate equipment installation in May 2012.

      Passengers may need to walk around the hoarding and modular fencing in order to access the existing entrance.

    • Renfrew Station: Station Alert

      Renfrew Station:
      Station Alert
      Jan 30 2012
      12:00:AM
      Priority: Minor

      Effective Monday January 30th to May, 2012.

      Construction will start at Renfrew Station in preparation for faregate equipment installation in May 2012.

      Passengers may need to walk around the hoarding and modular fencing in order to access the existing entrance.

    • Yaletown -Roundhouse Station: Station Alerts

      Yaletown -Roundhouse Station:
      Station Alerts
      Jan 30 2012
      12:00:AM
      Priority: Minor

      Effective Monday January 30th to May, 2012.

      Construction will start at Yaletown-Roundhouse Station in preparation for faregate equipment installation in May 2012.

      Passengers may need to walk around the hoarding and modular fencing in order to access the existing entrance.

    • Joyce-Collingwood Station: Station Alerts

      Joyce-Collingwood Station:
      Station Alerts
      Jan 24 2012
      12:00:AM
      Priority: Minor

      Effective Tuesday February 21st from 9:00am to 3:00pm.

      Due to scheduled maintenance The elevator from the Joyce Street entrance or Vanness Avenue entrance to the platform level will be out of service.

      Passengers requiring assistance are to pick up the red emergency phone located at street level or obtain assistance from a SkyTrain Attendant.


      Effective Monday October 17th, 2011 until further notice.

      The north-side entrance into the west-side of the station and the adjacent sidewalk will be closed.


      Effective Friday September 16th, 2011 until further notice.

      Due to accomodate Faregate construction the Kiss & Ride is closed. Passengers may no longer use this area as a drop-off/pick-up location. All parking stalls in this area will also be closed.

    • Rupert Station: Station Alert

      Rupert Station:
      Station Alert
      Jan 23 2012
      12:00:AM
      Priority: Minor

      Effective Monday January 16th to May, 2012.

      Construction will start at Rupert Station in preparation for faregate equipment installation in May 2012.

      Passengers may need to walk around the hoarding and modular fencing in order to access the existing entrance.

    • VCC-Clark Station: Station Alert

      VCC-Clark Station:
      Station Alert
      Jan 23 2012
      12:00:AM
      Priority: Minor

      Effective Monday January 16th to May, 2012.

      Construction will start at VCC-Clark Station in preparation for faregate equipment installation in May 2012.

      Passengers may need to walk around the hoarding and modular fencing in order to access the existing entrance.

    • Main Street Station: Station Alerts

      Main Street Station:
      Station Alerts
      Jan 19 2012
      9:00:AM
      Priority: Minor

      Effective Monday October 17th, 2011 until further notice.

      Hoarding and modular fencing will go up at Main Street Station for the start of faregate construction.

      Passengers will need to walk around the hoarding to access the existing station entrance.

    • Stadium Station: Station Alerts

      Stadium Station:
      Station Alerts
      Jan 18 2012
      9:00:AM
      Priority: Minor

      Effective Tuesday October 11th 2011, until further notice.

      Due to construction, the existing Expo Boulevard (Event) entrance at Stadium station will be closed and a new temporary entrance will be opened in its place.

      Passengers may access the new temporary entrance on Expo Boulevard.

    • Burrard Station: Elevator/Escalator out of Service

      Burrard Station:
      Elevator/Escalator out of Service
      Jan 17 2012
      12:00:AM
      Priority: Major

      Effective Tuesday January 17th to Friday February 24th, 2012 - Escalator Repairs

      Due to repairs the up escalator from westbound platform to ticket vending machines will be out service.


      Effective Monday September 26th, 2011 to Thursday March 15th, 2012 - Elevator Unavailable due to Faregate Construction

      Due to construction of the new faregate entrance hall at Burrard Station, the elevator will be out of service and the station listed as “non-accessible” for approximately four months.

      Customers who would normally need to use that elevator will need to go to Granville, Vancouver City Centre or Waterfront Station instead. On weekdays, the #44 connects Burrard Station with Waterfront from 6:37am (from Waterfront) until approximately 8:25pm (to Waterfront).

      We apologize for any inconvenience this may cause and appreciate our customers’ patience during this construction period.

    • King Edward Station: Station Alert

      King Edward Station:
      Station Alert
      Jan 16 2012
      12:00:AM
      Priority: Minor

      Effective Monday January 16th to May, 2012.

      Construction will start at King Edward Station in preparation for faregate equipment installation in May 2012.

      Passengers may need to walk around the hoarding and modular fencing in order to access the existing entrance.

    • Langara -49th Ave Station: Station Alert

      Langara -49th Ave Station:
      Station Alert
      Jan 16 2012
      12:00:AM
      Priority: Minor

      Effective Monday January 16th to May, 2012.

      Construction will start at Langara-49th Avenue Station in preparation for faregate equipment installation in May 2012.

      Passengers may need to walk around the hoarding and modular fencing in order to access the existing entrance.

    • Lougheed Town Centre Station: Station Alerts

      Lougheed Town Centre Station:
      Station Alerts
      Jan 16 2012
      12:00:AM
      Priority: Minor

      Effective Monday January 16th to May, 2012.

      Construction will start at Lougheed Station in preparation for faregate equipment installation in May 2012.

      Passengers may need to walk around the hoarding and modular fencing in order to access the existing entrance.

    • Marine Drive Station: Station Alert

      Marine Drive Station:
      Station Alert
      Jan 16 2012
      12:00:AM
      Priority: Minor

      Effective Monday January 16th to May, 2012.

      Construction will start at Marine Drive Station in preparation for faregate equipment installation in May 2012.

      Passengers may need to walk around the hoarding and modular fencing in order to access the existing entrance.

    • Oakridge -41st Ave Station: Station Alerts

      Oakridge -41st Ave Station:
      Station Alerts
      Jan 16 2012
      12:00:AM
      Priority: Minor

      Effective Monday January 16th to May, 2012.

      Construction will start at Oakridge-41st Avenue Station in preparation for faregate equipment installation in May 2012.

      Passengers may need to walk around the hoarding and modular fencing in order to access the existing entrance.

    • Bridgeport Station: Faregate Construction

      Bridgeport Station:
      Faregate Construction
      Jan 3 2012
      12:00:AM
      Priority: Minor

      Effective January 3 to May 2012

      Construction has begun at Bridgeport Canada Line station in preparation for faregate equipment installation in May 2012.

      Passengers may need to walk around the construction site to access the existing station entrance.

       

    • Waterfront Station: Station Alerts

      Waterfront Station:
      Station Alerts
      Dec 12 2011
      12:00:AM
      Priority: Minor

      Effective Monday, December 12th 2011 until May 2012.

      Construction will start at the HeliJet entrance, next to the SeaBus concourse at Waterfront Station, in preparation for faregate equipment installation.

      Passengers may need to walk around the hoarding and modular fencing in order to access the existing entrance.


       

       

    • Edmonds Station: Temp Ramp Entrance Opens

      Edmonds Station:
      Temp Ramp Entrance Opens
      Dec 5 2011
      12:00:AM
      Priority: Minor

      Effective Tuesday December 6th, 2011.

      The existing main entrance at the Edmonds station will be closed and a new temporary ramp entrance will open next to the main entrance.

      Passengers may access the new temporary ramp entrance located across from the pick-up/drop-off area.


      Effective Monday November 21st, 2011 until further notice.

      Hoarding and modular fencing will go up at Edmonds Station for the start of faregate construction.

      Passengers will need to walk around the hoarding to access the existing station entrance.

    • King George Station: Hoarding Construction

      King George Station:
      Hoarding Construction
      Oct 11 2011
      12:00:AM
      Priority: Minor

      Effective Wednesday October 12th 2011, until further notice.

      Due to construction, hoarding and modular fencing will go up at King George Station.

      Passengers will need to walk around the hoarding to access the existing station entrance.

    • 22nd Street Station: Hoarding Construction

      22nd Street Station:
      Hoarding Construction
      Sep 26 2011
      12:00:AM
      Priority: Minor

      Effective Monday September 26th until further notice.

      Due to construction, hoarding and modular fencing will go up at 22nd Street Station. Passengers will need to walk around the hoarding to access the existing station.

    • Nanaimo Station: Faregate Construction

      Nanaimo Station:
      Faregate Construction
      Sep 12 2011
      1:13:PM
      Priority: Minor

      Effective Monday September 12th, 2011 until further notice.

      Hoarding and modular fencing are up at Nanaimo Station.

      Passengers will need to walk around the hoarding to access the existing station entrance.

      Signage has placed around the construction area to direct customers.

    • Royal Oak Station: Temporary Entrance

      Royal Oak Station:
      Temporary Entrance
      Aug 23 2011
      10:00:AM
      Priority: Minor

      Effective Tuesday August 23rd, until further notice.

      Due to faregate construction, the main entrance at Royal Oak Station will be closed. A temporary entrance will be created to re-route passengers.

      Passengers can access the new temporary entrance at the back of Royal Oak Station.